AssetSentry ITPInspection & Test Plan travelers for the shop floor

Your ITP, built out in full, signed on the floor.

Each fabrication shop on this system has its own address, its own database and its own sign-in. Type your shop below to open it, or print the door card for the floor.

Only people your shop's QC or Admin has set up can sign in. Nothing here is shared between shops.
No shop by that name on this system. Check the spelling, or ask your QC for the address.
Open sign-in →

What the shop gets

The traveler is the shop's own ITP, row for row — not a generic checklist.

The whole ITP, every row

Pick the product ITP and every step, reference, acceptance criterion and report flag is already on the traveler. Then edit it if the job needs it.

Prod. · QC · 3rd Party

Each party signs its own column. A HOLD stops the rows below it until the holder releases. Witness, inspect, review and verify points sign as the work happens.

HWIRVM

WPS & welder on the row

Rows that record welder IDs will not sign without a WPS number and welder ID. Heat numbers and MTRs are on the traveler before material can be verified.

NCRs, photos, NDT reports

Raise an NCR on a step, attach the RT/UT report to the point that called for it, keep the photo log — all on the same record that prints as the data book.

One shop, one database

Each shop runs on its own address with its own database and its own user list. There is no cross-company query to get wrong.

Prints as the sheet

On screen the mark cells are the sign-off buttons. On paper it is the ITP — header block, legend, section bands, signature columns and the release block.

What a traveler looks like

Illustrative rows in the sheet layout. Your own ITP replaces these.

StepTask / InspectionReferenceAcceptanceReportProd.QC3rd PartySignatures / Date
3  Fabricate pressure part (constructed under Code Stamp)
3.1Verify material — heat numbers and MTRsFab drawing; material specMTR matches spec & heatYesMRQC · date
3.2Fit-up inspection; record welder IDsDrawing; WPSPer WPS & drawing tolerancesYesMWWPS · welder
3.5Final QC inspection before assemblyDrawingPer ITPITPMH— hold —
Third-party verification — section 3ITPV— pending —

Next shop?

Send us your ITP workbook. We build it out as your shop's own product content, put it on its own address with its own database, and walk your QC through the first traveler.

Request a demo

AssetSentry™ ITP — sign-in for the floor
Scan on a phone or tablet · your QC or Admin sets up who can sign · signatures are yours